← All projects Example

From Friday-night deploys to an automated cloud platform

Manual, risky releases replaced by CI/CD, infrastructure as code and a preview of every change.

Client
Typical client: software company, 5–20 developers
Duration
Typically 4–8 weeks

This is an illustrative example of a typical engagement, not a description of a specific client.

The challenge

Releases happen by hand in the evening, done by the one person who "knows the setup". Servers were configured manually and nobody dares to change them. Production bugs are found late and rarely rolled back quickly.

  • Knowledge held by one person
  • Environments behave differently
  • Rare, large and risky releases
  • Rolling back takes hours

How we solve it

  1. 01

    Health check

    We review the current setup, risks and bottlenecks, and agree on the target picture.

  2. 02

    Infrastructure as code

    Environments are described in Terraform and containers, so test and production match.

  3. 03

    CI/CD

    GitHub Actions builds, tests and deploys every change, with a preview for every pull request.

  4. 04

    Safe releases

    Small, frequent releases with health checks and one-click rollback. Training and handover to the team.

Before

  • Manual evening releases
  • Hand-configured servers
  • One person knows the setup
  • Rollback takes hours

After

  • Release on every merge
  • Environments described in code
  • The whole team can deploy
  • Rollback in minutes

Typical impact

  • More frequent, smaller releases with lower risk
  • New developers get productive faster
  • Less dependence on individuals
  • Evening work for releases typically disappears

Technology

  • GitHub Actions
  • Terraform
  • Docker
  • Cloudflare
  • AWS

Recognise the challenge?

Tell us what it looks like on your side and you’ll get a concrete proposal for the next step.